2018.04.26 09:00 Accelerator scheduled maintenance.
2018.04.22 13:47 NU:user op. restarted.
2018.04.22 13:45 MLF:user op. restarted.
2018.04.22 13:22 LI:restored.
2018.04.22 09:57 LI:beam stop due to QM62 power supply trouble
2018.04.22 04:31 MLF:user operation restarted(503kW)
2018.04.22 04:30 NU:user operation restarted(489kW)
2018.04.22 00:48 RCS:beam tuning
2018.04.21 22:51 LI:beam tuning
2018.04.21 04:00 Accelerator scheduled maintenance.
2018.04.21 03:19 MR:operation aborted due to RF6 trouble
2018.04.19 12:00 MLF:user operation restart(501kW)
2018.04.19 09:30 MLF:user operaton stop for high intensity tuning.
2018.04.17 03:37 NU:user op. restarted.
2018.04.16 21:39 MR:op. aborted as cooling water flow of a quadrupole magnet in the tunnel decreased. repairing work has to wait 4 hours. 
2018.04.13 04:14 NU:user operation start(486kW)
2018.04.13 03:22 MLF:user operation start(397kW)
2018.04.12 09:00 Accelerator scheduled maintenance.
2018.04.06 19:23 NU:intensity down(479kW) because of much loss at 3-50BT.
2018.04.06 18:57 NU:beam op. restart(485kW)
2018.04.06 12:06 MR:beam study.
2018.04.06 12:01 NU:op. stop(for beam study of MR)
2018.04.04 23:51 MLF:user op. started(398kW)
2018.04.04 22:33 NU:user op. started(485kW)
2018.04.02 10:00 RUN79 START!