Summary
J-PARC HOMEJapanese version
Summary
Message from the Project Director
J-PARC Accelerators and Science
Organization & Schedule
Newsletter
Construction photos
Facilities Information
Nuclear and Particle Physics Facility
Materials and Life Science Facility
Accelerator-Driven Transmutation Experimental Facility
Accelerator
Conference, Workshop
Committees
References
Link
J-PARC Access Map
Construction photos
Neutrino Monitor Pit
UA-1 magnet and Off-Axis Detectors
(Jan. 26, 2010)
Experimental Hall #2 for MLF
High-Performance Neutron Reflectometer with a Horizontal Sample Geometory for MLF
(Jan. 22, 2010)
Hadron Experimental Hall
(South floor)
(Jan 19, 2010)
Decay/Surface muon beamline/
D1 Instrument
(Jan. 7, 2010)
>> Past construction photos are here.
Page Top