開催日時: 平成14年10月28〜30日
場所: 原子力科学研究所
プログラム: こちらをご覧下さい。
Report on the first Meeting (PDF)
第1回会合報告書(和訳、PDF形式)
発表資料がこちらからご覧になれます。
I. Project Overviews Session | ||
---|---|---|
1-01 | Objectives and Introductory Guidance to the N-TAC | Y. Ikeda |
Greetings from the chairman of the advisory committee | J. White | |
1-02 | Project Overview | S. Nagamiya |
1-03 | Accelerator Overview | Y. Yamazaki |
Break | ||
1-04 | Materials and Life Science Facility Overview
Project schedule, budget and organization |
Y. Ikeda |
1-05 | Design Philosophy
Design requirements, Individual shutter, cold source concept, shutter inserts?, |
M. Furusaka/ N. Watanabe |
1-06 | Instrument Overview
Project-team Proposed Instruments, design-team organization, Strategy |
M. Arai |
II. JSNS Design Presentation Session-1 | ||
2-01 | Proton beam transport (3NBT)
Lattice and beam profile, beam broadening |
S. Sakamoto /S. Meigo |
2-03 | Cascade-target design for the muon facility | Miyake /Meigo |
2-04 | Heat deposition, radio-activity and shielding calculation
Code system, target station, target and moderator, heat generation, dpa |
Maekawa |
Lunch | ||
2-05 | Target system
Structure, thermal-hydraulic, structural analysis, Hg circulation system, target-trolley, safety-hull, heavy water cooling, life-time (5dpa), seal for Hg |
Hino |
Solid target back-up | ||
2-08 | Target remote-handling | Kinoshita |
V. JSNS Design Presentation Session-2 | ||
3-01 | Moderator-reflector system overview
Including neutronics, reflector Be & SS |
Teshigawara |
Moderator neutronics | ||
3-02 | Coupled |
Kai |
3-03 | Decoupled and poisoned |
Harada |
Break | ||
Moderator-reflector engineering | ||
3-04 | Moderator mechanical structure |
Kogawa |
3-07 | Reflector mechanical structure & Water-flow |
ditto |
3-05 | Hydrogen flow in moderators |
Aso |
Discussion | ||
adjourn | ||
Join the party for the ground breaking ceremony (Crystal Palace) |
V. JSNS Design Presentation Session-2 continued | ||
---|---|---|
Target station & shielding | ||
Low-temperature system | ||
3-08 | Loop overview, purge system |
Aso |
3-09 | Cryogenic loops Ushijima |
Ushijima |
Reflector and reflector-plug | ||
3-10 | Moderator-reflector remote-handling, transfer-lines |
Teshigawara |
IV. JSNS Design Presentation Session-3 | ||
4-01 | Target station structure |
Takada |
4-02 | Proton beam window |
Meigo |
Break | ||
4-03 | Target station shield design, shutter shield calculation., |
Maekawa |
Conventional facility, Ancillary, Safety | ||
4-04 | Building layout & Ancillary design status |
Kaminaga |
4-05 | Skyshine and other dose evaluation |
Konno |
V. Target strategy, other material issues | ||
5-01 | Hg Pitting Progress after the SNS EFAC meeting |
Futakawa |
5-06 | Project strategy on Hg target | Y. Ikeda |
5-07 | Solid target backup | Kiyanagi |
Lunch | ||
5-02 | Material AIC, Irradiation, Al |
Kikuchi |
Discussion Session | ||
Discussions for all technical design | ||
Break | ||
Discussions for all technical design Executive session & report writing Adjourn and reception |
Summary Session | ||
---|---|---|
Executive session & report writing-continued Summary End of TAC |
||
Lunch | ||
Optional tour of JKJ site |