![](../../../../picture/2010/12/a101223-271_s.jpg) |
![](../../../../picture/2010/12/a101208-909_s.jpg) |
![](../../../../picture/2010/10/a101015-409_s.jpg) |
Installation of Vacuum chamber for TAIKAN (Smaller-Angle Neutron Scattering Instrument) / in MLF-BL15 (Dec. 23, 2010) |
Installation of New ARISA-II (High-Performance Neutron Reflectometer with a Horizontal sample Geometry) / in MLF-BL16 (Dec. 8, 2010) |
Assemble of the spare RFQ (Radio Frequency Quadruple) linac / in Linac building (Oct. 15, 2010) |
![](../../../../picture/2010/09/a100928-970_s.jpg) |
![](../../../../picture/2010/09/a100908-471_s.jpg) |
![](../../../../picture/2010/04/100421-806_s.jpg) |
Installation of the barrel ECALs for ND280 / in Neutrino Monitor Pit (Sep. 28, 2010) |
Piling up CsI crystals at the detector end-cap / in Hadron Experimental Hall (South floor) (Sep. 8, 2010) |
PLANET: (High) Pressure Leading Apparatus for Neutron Diffraction/MLF-BL11 (April 21, 2010) |
![](../../../../picture/2010/04/100421-804_s.jpg) |
![](../../../../picture/2010/04/100415-737_s.jpg) |
![](../../../../picture/2010/04/100415-727_s.jpg) |
Neutron Optics and Fundamental Physics/MLF-BL05 (April 21, 2010) |
Hadron Experimental Hall (South floor) Construction for K1.8BR (April 15, 2010) |
Hadron Experimental Hall (South floor) ElectroMagnet (April 15, 2010) |
![](../../../../picture/2010/01/100126-028_s.jpg) |
![](../../../../picture/2010/01/100122-049_s.jpg) |
![](../../../../picture/2010/01/100119-119_s.jpg) |
Neutrino Monitor Pit UA-1 magnet and Off-Axis Detectors (Jan. 26, 2010) |
Experimental Hall #2 for MLF High-Performance Neutron Reflectometer with a Horizontal Sample Geometory for MLF (Jan. 22, 2010) |
Hadron Experimental Hall (South floor) (Jan 19, 2010) |
![](../../../../picture/2010/01/100107-054_s.jpg) |
![](../../../../img/spacer.gif) |
![](../../../../img/spacer.gif) |
Decay/Surface muon beamline/ D1 Instrument (Jan. 7, 2010) |
![](../../../../img/spacer.gif) |
![](../../../../img/spacer.gif) |