Video & Photos

Construction photos in 2010

Installation of Vacuum chamber for TAIKAN (Smaller-Angle Neutron Scattering Instrument) 
 / in MLF-BL15
 (Dec. 23, 2010) 
Installation of New ARISA-II
 (High-Performance Neutron Reflectometer with a Horizontal sample Geometry)  / in MLF-BL16
 (Dec. 8, 2010) 
Assemble of the spare RFQ (Radio Frequency Quadruple) linac
 / in Linac building
 (Oct. 15, 2010) 
Installation of the barrel ECALs for ND280 / in Neutrino Monitor Pit
 (Sep. 28, 2010) 
Piling up CsI crystals at the detector end-cap / in Hadron Experimental Hall (South floor) 
 (Sep. 8, 2010) 
PLANET: (High) Pressure Leading Apparatus for Neutron
Diffraction/MLF-BL11 
 (April 21, 2010) 
Neutron Optics and Fundamental Physics/MLF-BL05 
 (April 21, 2010) 
Hadron Experimental Hall
 (South floor) 
Construction for K1.8BR
 (April 15, 2010) 
Hadron Experimental Hall
 (South floor) ElectroMagnet
 (April 15, 2010)
Neutrino Monitor Pit
UA-1 magnet and Off-Axis Detectors
(Jan. 26, 2010)
Experimental Hall #2 for MLF
High-Performance Neutron Reflectometer with a Horizontal Sample Geometory for MLF
(Jan. 22, 2010)
Hadron Experimental Hall
(South floor)
(Jan 19, 2010)
Decay/Surface muon beamline/
D1 Instrument
(Jan. 7, 2010)


PAGE TOP