![](../../../../picture/2005/06/IMG_2659_s.jpg) |
![](../../../../picture/2005/06/IMG_2686_s.jpg) |
![](../../../../picture/2005/06/IMG_2737_s.jpg) |
Linac Building (June 1, 2005) |
Linac Building and Linac Power Substation (June 7, 2005) |
Power source room for Klystron on the 1st floor of Linac Building (June 16, 2005) |
![](../../../../picture/2005/06/IMG_2749_s.jpg) |
![](../../../../picture/2005/06/IMG_2700_s.jpg) |
![](../../../../picture/2005/06/IMG_2760_s.jpg) |
Klystron gallery on the 1st floor of Linac Building (June 16, 2005) |
Middle tunnel on the 1st basement level of Linac Building (June 7, 2005) |
Accelerator tunnel on the 2nd basement level of Linac Building (June 16, 2005) |
![](../../../../picture/2005/06/IMG_2754_s.jpg) |
![](../../../../picture/2005/06/IMG_2726_s.jpg) |
![](../../../../picture/2005/06/IMG_2791_s.jpg) |
Accelerator tunnel on the 2nd basement level of Linac Building (June 16, 2005) |
Accelerator tunnel on the 2nd basement level of Linac Building (June 7, 2005) |
3GeV Syncrotron Building (June 17, 2005) |
![](../../../../picture/2005/06/IMG_2735_s.jpg) |
![](../../../../picture/2005/06/IMG_2881_s.jpg) |
![](../../../../picture/2005/06/IMG_2843_s.jpg) |
3GeV Synchrotron Building and Linac Power Substation (June 7, 2005) |
Accelerator tunnel on the 2nd basement level of 3GeV Synchrotron Building (June 21, 2005) |
3GeV Synchrotron Building and Hakken pathway (June 21, 2005) |
![](../../../../picture/2005/06/IMG_2553_s.jpg) |
![](../../../../picture/2005/06/IMG_2545_s.jpg) |
![](../../../../picture/2005/06/IMG_2649_s.jpg) |
From the construction area II of Materials and Life Science Experimental Facility (May 23, 2005) |
From the construction area I of Materials and Life Science Experimental Facility (May 23, 2005) |
M2 Machine Building and outside platform (June 1, 2005) |
![](../../../../picture/2005/06/IMG_2642_s.jpg) |
![](../../../../picture/2005/06/IMG_2637_s.jpg) |
![](../../../../picture/2005/06/IMG_2764_s.jpg) |
D3 Electric Building and outside platform (June 1, 2005) |
The construction area C of 50GeV Synchrotron (June 1, 2005) |
Nuclear and Particle physics Experimental Faclity (June 16, 2005) |
![](../../../../picture/2005/06/IMG_2772_s.jpg) |
![](../../../../picture/2005/06/IMG_2824_s.jpg) |
![](../../../../img/spacer.gif) |
The construction area D1 of 50GeV Synchrotron (June 16, 2005) |
Crossing section of decay volume and 3NBT (the beam transport line from the 3GeV Synchrotron to the Neutron target) (June 21, 2005) |
![](../../../../img/spacer.gif) |