Klystron on the 1st floor of Linac Building (December 15, 2005) |
Klystron on the 1st floor of Linac Building (December 15, 2005) |
RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
|
|
|
RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
DTL at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
DTL at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
|
|
|
Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
Debuncher in Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
|
|
|
Bending magnet at the downstream of Accelerator Tunnel on the 2nd basement level of Linac Building (December 15, 2005) |
Quadrupole magnet in L3BT (From the downstream to the upstream) (December 15, 2005) |
Quadrupole magnet in 3NBT (From 3NBT to 3GeV) (December 15, 2005) |
|
|
|
Quadrupole magnet in 3NBT (To MLF) (December 15, 2005) |
Quadrupole magnet in 3NBT (Downstream) (December 15, 2005) |
Quadrupole magnet in 3NBT (Downstream) (December 15, 2005) |
|
|
|
Injection section of 3GeV Accelerator Tunnel (December 15, 2005) |
Bending magnet in 50GeV Accelerator Tunnel (December 15, 2005) |
Neutrino divergence part in 50GeV Accelerator Tunnel (December 15, 2005) |
|
|
|
Bending magnet in 50GeV Accelerator Tunnel (December 15, 2005) |
Bending magnet in 50GeV Accelerator Tunnel (December 15, 2005) |
3-50BT Tunnel (From 50GeV to 3GeV) (December 15, 2005) |
|
|
|
3GeV Synchrotron Building 1 (December 13, 2005) |
3GeV Synchrotron Building 2 (December 13, 2005) |
3GeV Synchrotron Building 3 (December 13, 2005) |
|
|
|
Hakken pathway 1 (December 13, 2005) |
Hakken pathway and 3NBT fill (December 13, 2005) |
Hakken pathway 2 (December 14, 2005) |
|
|
|
3NBT Building and Material and Life Sciences Experimental Facility (December 14, 2005) |
Hadron Experimental Facility and Carrying Building (December 13, 2005) |
Fill of the construction area B of 50GeV Synchrotron and Electric Building #3 (December 13, 2005) |
|
|
|
Material and Life Sciences Experimental Facility and Machine Building #3 (December 14, 2005) |
Material and Life Sciences Experimental Facility and Neutrino Arc Part (December 14, 2005) |
Neutrino Arc Part and Machine Building #3 (December 14, 2005) |
|
|
|
The construction area D2 of 50GeV Synchrotron (December 14, 2005) |
The construction area D1 and D2 of 50GeV Synchrotron (December 14, 2005) |
The construction area D1 of 50GeV Synchrotron (December 13, 2005) |
|
|
|
The construction area D1 and D2 of 50GeV Synchrotron (December 14, 2005) |
The construction area D1 of 50GeV Synchrotron and Machine Building #1 (December 14, 2005) |
The construction area D1 of 50GeV Synchrotron and Carrying Building #1 (December 14, 2005) |
|
|
|
The construction area D1 of 50GeV Synchrotron (December 13, 2005) |
The construction area D1 of 50GeV Synchrotron (December 13, 2005) |
The construction area C of 50GeV Synchrotron (December 13, 2005) |
|
|
|
Material and Life Sciences Experimental Facility (West side) (December 12, 2005) |
Material and Life Sciences Experimental Facility (South side) (From Hadron Experimental Hall) (November 30, 2005) |
Material and Life Sciences Experimental Facility (East side) (November 30, 2005) |
|
|
|
Hadron Experimental Facility 1 (December 13, 2005) |
Hadron Experimental Facility 2 (December 13, 2005) |
Hadron Experimental Facility and Material and Life Siences Experimental Facility and Carrying Building #2 (December 29, 2005) |