Video,Photo

Construction photos in Dec. 2005

Klystron on the 1st floor of Linac Building
(December 15, 2005)
Klystron on the 1st floor of Linac Building
(December 15, 2005)
RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
RFQ Linac at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
DTL at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
DTL at the upstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
Quadrupole magnet in Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
Debuncher in Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
Bending magnet at the downstream of Accelerator Tunnel on the 2nd basement level of Linac Building
(December 15, 2005)
Quadrupole magnet in L3BT
(From the downstream to the upstream)
(December 15, 2005)
Quadrupole magnet in 3NBT
(From 3NBT to 3GeV)
(December 15, 2005)
Quadrupole magnet in 3NBT
(To MLF)
(December 15, 2005)
Quadrupole magnet in 3NBT
(Downstream)
(December 15, 2005)
Quadrupole magnet in 3NBT
(Downstream)
(December 15, 2005)
Injection section of 3GeV Accelerator Tunnel
(December 15, 2005)
Bending magnet in 50GeV Accelerator Tunnel
(December 15, 2005)
Neutrino divergence part in 50GeV Accelerator Tunnel
(December 15, 2005)
Bending magnet in 50GeV Accelerator Tunnel
(December 15, 2005)
Bending magnet in 50GeV Accelerator Tunnel
(December 15, 2005)
3-50BT Tunnel
(From 50GeV to 3GeV)
(December 15, 2005)
3GeV Synchrotron Building 1
(December 13, 2005)
3GeV Synchrotron Building 2
(December 13, 2005)
3GeV Synchrotron Building 3
(December 13, 2005)
Hakken pathway 1
(December 13, 2005)
Hakken pathway and 3NBT fill
(December 13, 2005)
Hakken pathway 2
(December 14, 2005)
3NBT Building and Material and Life Sciences Experimental Facility
(December 14, 2005)
Hadron Experimental Facility and Carrying Building
(December 13, 2005)
Fill of the construction area B of 50GeV Synchrotron
and Electric Building #3
(December 13, 2005)
Material and Life Sciences Experimental Facility
and Machine Building #3
(December 14, 2005)
Material and Life Sciences Experimental Facility
and Neutrino Arc Part
(December 14, 2005)
Neutrino Arc Part
and Machine Building #3
(December 14, 2005)
The construction area D2 of 50GeV Synchrotron
(December 14, 2005)
The construction area D1 and D2 of 50GeV Synchrotron
(December 14, 2005)
The construction area D1 of 50GeV Synchrotron
(December 13, 2005)
The construction area D1 and D2 of 50GeV Synchrotron
(December 14, 2005)
The construction area D1 of 50GeV Synchrotron
and Machine Building #1
(December 14, 2005)
The construction area D1 of 50GeV Synchrotron
and Carrying Building #1
(December 14, 2005)
The construction area D1 of 50GeV Synchrotron
(December 13, 2005)
The construction area D1 of 50GeV Synchrotron
(December 13, 2005)
The construction area C of 50GeV Synchrotron
(December 13, 2005)
Material and Life Sciences Experimental Facility (West side)
(December 12, 2005)
Material and Life Sciences Experimental Facility (South side)
(From Hadron Experimental Hall)
(November 30, 2005)
Material and Life Sciences Experimental Facility (East side)
(November 30, 2005)
Hadron Experimental Facility 1
(December 13, 2005)
Hadron Experimental Facility 2
(December 13, 2005)
Hadron Experimental Facility and Material and Life Siences Experimental Facility and Carrying Building #2
(December 29, 2005)