Accelerators

Operation

At 22:27 of May 22nd 2008
The 3 GeV proton beams from the RCS were successfully injected into the Main Ring. The beam was captured by RF and extracted to the beam dump after 1000 turns.

The outline of accelerator complex

The composition of the accelerators

The accelerators of J-PARC have been composed by three stages called LINAC,RCS,MR  in figure. Both linac and RCS have next stage of accelerator and experimental hall.
MR has two ejection lines for the purpose independence.

layoutJ

Please click "About Accelerator" for more detail

 

Operation before earthquake ( power etc. )

 

  LINAC RCS MR
Extraction Beam Energy 180 Mev 3 GeV 30 GeV
Repetition 40ms (25 Hz) 40ミms (25 Hz) 3.2 - 6.0s
Average Beam Current 15 mA x 500 μs 60 μA(Average) 5 μA(Average)
Average Beam Power Maximum30 kW 200 kW 150 kW

Designed Value

Result in last year

 

News & Topics

New Reports or Web pages

 

When you wish accelerator experiments

Collaboration with KEK - Academic (Japanese only)
Collaboration with KEK - Enterprise (Japanese only)
Collaboration with JAEA (Japanese only)

Terminal Syugo