Transmutation Experimental Facility (TEF) is composed of two experimental facilities,
Transmutation Physics Experimental Facility (TEF-P) and
ADS Target Test Facility (TEF-T).
TEF-P equips a critical assembly to investigate physical and
dynamic properties of the accelerator-driven system (ADS) by using low power (10W) proton beam.
Uranium, Plutonium and minor actinide fuels are planned to be loaded into the assembly.
TEF-T is a facility to examine the existence of ADS by engineering viewpoint.
Liquid lead-bismuth spallation target is installed to the TEF-T and
is irradiated by 600MeV-200kW proton beam.
The proton beam line to connect these two experimental facilities is called ADS-BT.
ADS-BT has a special device to extract very low power proton beam (10W)
for TEF-P from high power proton beam (200kW) for TEF-T.
TEF-P is a plate-type fuelled critical assembly which is able to introduce a proton beam (600MeV, 10W) delivered from the LINAC of J-PARC. Various experiments are available in a critical condition or a sub-critical state driven by spallation neutrons. Furthermore, the experiments using pin-type MA fuel, which will be handled with remote devices, are planned to simulate the MA-loaded systems.
TEF-T is a facility to examine the experiments for material and thermo-hydraulics. Liquid lead-bismuth (LBE, Pb-Bi) spallation target will be installed to the TEF-T because the ADS designed by JAEA employs LBE as the coolant and spallation target material. LBE installed to the TEF-T will be irradiated by 600MeV-200kW proton beam.