Information

2023.04.25

On the Fire in MR Power Supply Building No.2 of J-PARC

Japan Atomic Energy Agency (JAEA)
Nuclear Science Research Institute
High Energy Accelerator Research Organization (KEK)

 

   1. Time and Date :

Around 17:15 on Tuesday, April 25, 2023

   2. Location :

MR Power Supply Building No.2 of J-PARC
(This building, located in Nuclear Science Research Institute of JAEA and under the jurisdiction of High Energy Accelerator Research Organization (KEK) , is not a radiation-controlled area.)

   3. Description :

On April 25, 2023, a power supply in MR Power Supply Building No.2 of J-PARC, used for magnets, indicated abnormal state. At around 17:15, a KEK staff inspected the site and observed a fire from a transformer in a power-supply panel. The same staff conducted the initial fire extinguishing with a powder fire extinguisher and called the fire department. At 17:58, the fire department judged this as a fire incident, and the fire had already been extinguished.
(Time series)
17:15  A KEK staff inspected the site and observed a fire from a transformer.
17:15  The same staff started the initial fire extinguishing with a powder fire extinguisher.
17:16  Initial firefighting was completed.
17:23  The staff called the fire department.
17:45  The fire department arrived.
17:58  The fire department judged this as a fire incident, and the fire had already been extinguished.

   4. Cause of the fire incident :

Under investigation

   5. Effects :

There was no leakage of radioactive material to the environment, no radiation exposures, no injuries. There was no impact on other facilities.